How to reduce energy consumption

Asia - Pacific
IMI Hydronic Engineering
IMI Hydronic Engineering designed and installed the heating and cooling system for the National Centre for Infectious Diseases in Singapore. The system incorporates the division’s TA Modulator valves which ensure the system is accurately balanced, maintains a comfortable indoor climate with stable and precise temperature control and a high level of energy efficiency.